The Plough, Clanfield Refurb

This is or first project with Concorde BW. Our works consist of forming a new bar area to the rear, Staff room and internal drainage adjustments.


Works began on the Bar/Orangery area where we dug to reduce level diverted the existing drains and poured new footing.


We then proceeded to install the new drainage and new SW drainage which included a crate soak away.


There was some underpinning to do to the existing building where the old walls were exposed with the change in levels.




Whilst the still frame was being built on the orangery area we moved inside to complete the drainage adjustments for the kitchen area and poured a new internal slab.