Crown Of Crusis Refurb

Another project with our friends at ConcordeBGW. KCC have been brought in to assist with installing the new drainage and preparation for the external works of the Crown of Crusis pub in Cirencester


The whole ground floor is reinforced with 3 ft of concrete in places and has made work extremely difficult due to access with only a mini digger. With the amount of breaking we had no way to do it by hand due to manual handling and HAVS.


External Works.


The outside seating area was overhauled with a new timber decking and seating pods along with Indian Sandstone paving throughout.




At the end of the paving area there was a slab poured for a new external bar.