Quad 1 Pavillion Slab Poured
- John Cook
- Jul 19, 2017
- 1 min read
After the ground was stabalised KCC dug and poured the foundations to receive the steel frame. This went up in only a few days which allowed us to install the underground drainage. We then shuttered and prepared the slab.